Insurance Coverage forged for the job.
The pipeline
Arizona's building boom is here.
A crew waiting for power that will not come on. Emergency rental at emergency rates, pours pushed, testing rescheduled, and general conditions accruing on a site producing nothing.
The coverage conversationContractors equipment · Equipment breakdown · Rented equipment · Builders risk soft costs · Delay in completion
How a GC gets measured
Success requires two things.
Coverage is not where those get lost. The unplanned is.
Winning the work
The record you bid with
Nobody awards a project because of your certificate. They award it because your last six closed clean. Coverage helped keep that record intact from one project to the next.
Delivering the promise
Insurance is schedule
A certificate that does not match the contract stops mobilization. A trade with the wrong endorsement cannot get on site. The schedule absorbs every hour of it.
Pumping and stabilization, damaged forms, rebar and stored materials, retesting, remobilization, extended rentals, overtime, and financing that keeps running.
The coverage conversationBuilders risk · Flood and water endorsements · Equipment · Pollution · Soft costs and delay in completion
Now you have it. Keeping it is the other job.
In the wrong direction. The contract price does not move when the schedule slips. The cost of delivering it does.
Ten million dollar contract, at a 4.4% pretax margin
$440,000
Unrecovered delay costs
− $250,000
Contractual damages
− $100,000
What is left. A 4.4% job, delivered at 0.9%.
$90,000
Illustrative. Margins are company-level, not per-job. CFMA Construction Financial Benchmarker, 2025.
Evacuation, emergency response, utility repair, road closure, business interruption downstream, investigation, and a site nobody can work.
The coverage conversationGeneral liability · Pollution · Professional liability · Underground property damage endorsement · Excess liability
Not everything that stops a job is a loss
What decides the damage is whether somebody thought it through first.
None of these are automatically covered
Which of these your program answers is a construction question, asked by somebody who has read the contract.
Repair, smoke and water damage, debris removal, redesign, long-lead replacement materials, extended general conditions, and owner claims that follow.
The coverage conversationBuilders risk · Delay in completion · Soft costs · General liability · Excess liability
What a specialist does differently
While our competitors strive to offer some things to all people, our focus is on providing all things to some people. It is the difference between being a mile wide and half an inch deep, and being half an inch wide and a mile deep.
Job conditions
The trades, the sites, the payroll, the subcontractors, the vehicles, the contract requirements.
Policy language
Written for a category, not for this job. Exclusions most contractors are not equipped to read.
The documented gap
Where the two do not meet. Named in writing, with the scenario and the economic consequence.
The review
Closed before it surfaces on its own. Certificates turned correctly. Renewals managed before you ask.